Field notes
Why two quotes for the same job look nothing alike
Short pieces on the line items that explain the gap between bids. No sales pitch, no pretending the cheaper contractor is the dishonest one — usually they are quoting a different job, and these are the questions that tell you which.
-
Roofing — asphalt shingle replacement
Two roof quotes, six thousand apart, both honest
Nobody is lying to you. The cheaper contractor is quoting a different job, and four line items will tell you which one.
Read → -
Windows — replacement
Insert or full frame, multiplied by fourteen
Two installers can both say “window replacement” and mean genuinely different jobs. On one window the difference is modest. On a whole house it is most of the gap between your quotes.
Read → -
Furnace replacement — gas forced air
The furnace bid that didn’t mention the chimney
Moving to a high-efficiency furnace takes it off the chimney entirely. That leaves your water heater alone in a flue built for two appliances, and somebody has to deal with it.
Read → -
Sewer line — lateral repair
Nobody can price a pipe they haven’t looked inside
Spot repair, lining and full replacement sit thousands of dollars apart, and the only thing that decides between them is footage from a camera. A quote without one is a guess with a number on it.
Read →
We ask these questions for you, then read every quote against the same checklist.
Check coverageWritten for homeowners · General guidance, not a code ruling